United Orthopedic
United Orthopedic U2 MB Knee Proximal Tibial Preparation Tibial Baseplate Trial Alignment Rod Tibial Baseplate Trial Handle Instruments I. Tibial Baseplate Sizing Attach the Tibial BaseplateTrial Handle to the Tibial BaseplateTrial and size the tibia. Alternatively, insert an Alignment Rod in the guide hole on the Tibial BaseplateTrial Handle and have the rod parallel to the tibial axis and its distal end aligned with the second toe as a reference for tibial baseplate position. Tibial Baseplate Trial MBATibial Boss Drill MBTibial Boss Drill* Tibial Drill Guide Head Pin Proximal Tibial Preparation Instruments I. Creating Space for Tibial Baseplate Fix the Tibial BaseplateTrial on the tibia with 2 Head Pins . Attach the Tibial Drill Guide and drill an opening with the MBA Tibial Boss Drill until fully seated. Then remove the Tibial Drill Guide and MBA Tibial Boss Drill . If the cemented or press fit extension stem is needed, please refer to the Appendix B-1 or B-2. Fix with Head Pins *For MB Tibial Baseplate, using the MB Tibial Boss Drill in creating baseplate space. 31 32
Made with FlippingBook
RkJQdWJsaXNoZXIy MTcyNTM=