United Orthopedic

United Orthopedic U2 MB Knee CR Pegs Preparation CR Femoral Trial Femoral Condyle Drill Instruments G. Drill the fixation peg holes on the CR Femoral Trial with the Femoral Condyle Drill . PS Box Preparation CR Femoral Trial PS Cutting Jig Drill Guide Round Pin PS Notch Cutting Jig Instruments H. Position the PS Notch Cutting Jig With the reusable CR Femoral Trial in place, insert the PS Cutting Jig Drill Guide onto one fixation peg hole. Drill a pilot hole with 3.2 mm Drill through the pin hole on the drill guide and place a Round Pin through the drill guide to further position the PS Notch Cutting Jig . Remove the CR Femoral Trial and secure the PS Notch Cutting Jig with Threaded Pins . The M/L width of PS Notch Cutting Jig is the same as the M/L width of the implant. Fix with Threaded Pins Round Pin Threaded Pin 30 mm/50 mm 3.2mm Drill 27 28

RkJQdWJsaXNoZXIy MTcyNTM=